Renovation Progress Update Week 2

We are into week 2 of our office/bathroom construction and the dust continues to fly!  Most of the demolition work is completed and the reconstruction is well under way.  

Phase one of our project involves the demolition and rebuild of the bathroom which adjoins the Black Tie consultation room, office and Robin’s hairstyling salon.  Last week we posted some of the before photos and the demolition in progress.  Today we can see some real progress on the rebuild and can get a rough idea of the layout of

Beginnings of a new custom shower, insulation and reroute of hair salon plumbing located on opposite side of wall.

the new room. 

The walls of the new shower are now being constucted and the plumbing for Robin’s hair salon, which is on the opposite side of the wall, has been redone.  The salon bowl previously was routed to a floor drain (which wasn’t good) and now goes to an actual drain.   The shower plumbing has been moved from the outside block wall to an inside wall to prevent freezing.  Additional insulation is being added to ensure a nice warm bathroom. 

We are in the process of selecting floor and wall tile and new fixtures.  The fun continues!

View from laundry room. Rooms will eventually be separated again.

Old floor outline visible along with the beginnings of the new layout.

Shower walls being formed.